Hut 8 Teams Up with Anthropic and Fluidstack to Build Hyperscale AI Data Centers

TLDR:

  • Hut 8 to provide 245–2,295 MW of AI data center capacity across U.S. sites.
  • River Bend campus in Louisiana to host initial 245 MW IT capacity with 330 MW utility support.
  • Anthropic secures Right of First Offer for 1,000 MW expansion at River Bend.
  • Fluidstack to operate high-performance clusters for scalable AI compute workloads.

Hut 8 Corp., a leading Bitcoin mining and energy infrastructure company, announced a strategic partnership with Anthropic and Fluidstack. 

The collaboration focuses on accelerating the deployment of hyperscale AI infrastructure across the United States. Hut 8 will leverage its energy-first approach to develop substantial AI data center capacity, supporting Anthropic’s growing computational needs.

The partnership is set to deliver at least 245 megawatts (MW) and up to 2,295 MW of AI infrastructure. 

Hut 8’s integrated platform combines power, digital infrastructure, and compute at scale to address the energy demands of advanced AI workloads. The development aligns utility capacity with high-performance clusters operated by Fluidstack, creating a foundation for large-scale AI deployments.

River Bend Campus Launch

The initial phase will be implemented at Hut 8’s River Bend campus in Louisiana. The project will introduce 245 MW of IT capacity, supported by 330 MW of utility capacity, to meet Anthropic’s computational requirements. 

This stage establishes a framework for expanding AI data center operations efficiently.

Asher Genoot, CEO of Hut 8, said,

“Scaling frontier AI infrastructure is, at its core, a power challenge. Hut 8’s power-first, innovation-driven development model enables us to originate and develop greenfield data center sites at the pace and scale required by leading model developers.” 

The statement emphasizes Hut 8’s focus on integrating energy and computing infrastructure for AI growth.

The River Bend campus will serve as a central hub, providing a scalable platform for future expansions. 

Hut 8 and Fluidstack will coordinate closely to deliver operational efficiency while maintaining high-performance computing standards. The site is positioned to support both immediate and long-term AI deployment goals.

Hut 8 Expansion Opportunities and Strategic Growth

Hut 8 grants Anthropic a Right of First Offer for up to 1,000 MW of additional IT capacity at River Bend. 

This provision allows Anthropic to secure expanded computational resources as the demand for AI infrastructure grows. It provides a structured path for scaling operations without significant delays.

The partnership also includes optional development of up to 1,050 MW across Hut 8’s broader pipeline. 

Both companies will jointly evaluate additional sites to expand the infrastructure footprint beyond River Bend. This approach ensures flexibility and responsiveness to evolving AI computational requirements.

James Bradbury, Head of Compute at Anthropic, stated,

“This partnership is an expansion of our existing work with Fluidstack and marks a new opportunity to collaborate with Hut 8 to bring additional capacity online by early 2027.” 

The comment reinforces Anthropic’s confidence in Hut 8’s ability to deliver large-scale infrastructure.

Operational Collaboration with Fluidstack

FluidStack will operate high-performance clusters to optimize the compute workload. The company specializes in managing complex, large-scale computing environments, ensuring performance reliability. 

This collaboration brings together energy, infrastructure, and computing expertise in one integrated platform.

Gary Wu, Co-founder and CEO of Fluidstack, said,

“Fluidstack was built to solve compute challenges at scale, across every level of complexity. As Anthropic pushes the frontier of AI, we’re proud to work alongside partners such as Hut 8 to design, deploy, and operate the foundational infrastructure.” 

The statement underlines Fluidstack’s operational role in the partnership.

The collaboration establishes a roadmap for phased development while aligning utility capacity with emerging AI demands. 

Hut 8’s energy-driven strategy, combined with Fluidstack’s operational capabilities, supports a large-scale rollout of AI infrastructure efficiently.

Hut 8 will host a conference call on December 17, 2025, at 12:00 p.m. ET to discuss the partnership in detail, providing investors with further insights.

The post Hut 8 Teams Up with Anthropic and Fluidstack to Build Hyperscale AI Data Centers appeared first on Blockonomi.

Source: https://blockonomi.com/hut-8-teams-up-with-anthropic-and-fluidstack-to-build-hyperscale-ai-data-centers/